MIL-DTL-2902E
TABLE I. Sampling plan.
Allowable
Lot size
Sample size
defective units
2 to 15
2
0
16 to 25
3
0
26 to 90
5
0
91 to 150
8
0
151 to 280
13
0
281 to 500
20
0
501 to 1200
32
0
1201 to 2000
50
0
4.3 Inspection.
4.3.1 Assemblies. The samples selected in accordance with 4.2.2 shall be subjected to
surface inspection to determine compliance with this specification. Particular attention shall be
given to the effect on the coatings used on the oval sleeves, when appropriate, and to the overall
workmanship of the oval sleeves following the swaging operation. The self-locking snaphook
shall be operated to determine conformance to the requirements of 3.2.2.1.
4.4 Test.
4.4.1 Proof tests. All type I assemblies shall be strength tested to a tension of 1500 ± 20
pounds for a period of not less than 5 minutes and all type II assemblies shall be strength tested
to a tension of 750 ± 10 pounds for a period of not less than 5 minutes before they are inspected
in accordance with 4.3.1.
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as
specified in the contract or order (see 6.2). When packaging of materiel is to be performed by
DoD or in-house contractor personnel, these personnel need to contact the responsible packaging
activity to ascertain packaging requirements. Packaging requirements are maintained by the
Inventory Control Point's packaging activities within the Military Service or Defense Agency, or
within the military service's system commands. Packaging data retrieval is available from the
managing Military Department's or Defense Agency's automated packaging files, CD-ROM
products, or by contacting the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful,
but is not mandatory.)
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business